Last updated: Jan 08, 2020 15:25
Perfecto features
The checkWindow
method of AppliBase.java showcases how Perfecto Smart Reporting identifies Applitools checkWindow
operations as steps.
The same method showcases how the pass/fail status of Applitools Eyes along with the direct result links are integrated within Perfecto Smart Reporting.
The following screenshots illustrate a pass and fail scenario.
This seamless integration can save a lot of precious time when thousands of scripts are executed overnight, allowing the user to focus on Perfecto Smart Reporting for overall results and navigate to the Applitools report in case of any unresolved failures.
Applitools features
SampleTest.java contains examples to showcase the Applitools ability to verify the following:
To implement the above within your organization, or for help with implementing anything else, reach out to Perfecto Professional Services.